Turntable is fully wired up and has the DCC connected. The command control for the roundhouse has gotten tons more wiring done to it as well as a dedicated power supply that puts out multiple voltages. Next i will be soldering leads to each stall's track for thr DCC.
Today the sliding locks were installed on the swinging gate on the inside of the room so the gate can not accidentally be opened from a passer by. The 14 gauge track power wires where then routed to the gate on the hinged side so the wires are not in any danger of being cut or shorting out with the opening and closing.
Started shooting a track installation video today showing the steps involved. Got the cork road bed install filmed and just waiting for the glue to dry to continue. The video should be out this weekend.
Today I painted the trolley inside and out with a bright gloss red. I will let it cure overnight before even thinking of touching it. LOL
|
Categories
All
Archives
October 2023
|